Electro Industries Shark 200T Spezifikationen Seite 98

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 298
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 97
Doc# E149701 5 - 20
5: Communication Installation
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
3. Click OK.
To configure a Limit:
Double-click on the field to set the following values:
Above and Below Setpoint: % of Full Scale (the point at which the reading goes
out of limit)
Examples:
100% of 120V Full Scale = 120V
90% of 120V Full Scale = 108V
Above and Below Return Hysteresis: the point at which the reading goes back
within limit (see figure below)
Examples:
Above Setpoint = 110%; Below Setpoint = 90%
(Out of Limit above 132V);(Out of Limit below 108V)
Above Return Hysteresis = 105%; Below Return Hysteresis = 95%
(Stay out of Limit until below 126V)(Stay out of Limit until above 114V)
Primary Fields: These fields are display only. They show what the setpoint and
return hysteresis value are for each limit.
TIME
Above Limit
condition
Below Limit
condition
Above Limit Trigger poin
t
Return point from Above Limit condition
Below Limit Trigger poin
t
Return point from Below Limit condition
HYSTERESIS
HYSTERESIS
-
MEASURED VALUE
(if applicable)
+
MEASURED VALUE
0
Seitenansicht 97
1 2 ... 93 94 95 96 97 98 99 100 101 102 103 ... 297 298

Kommentare zu diesen Handbüchern

Keine Kommentare