Electro Industries Shark 200T Spezifikationen Seite 49

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 298
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 48
Doc# E149701 3 - 1
3: Mechanical Installation
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
3: Mechanical Installation
3.1: Introduction
The Shark® 200 meter can be installed using a standard ANSI C39.1 (4” round) or an
IEC 92mm DIN (square) form. In new installations, simply use existing DIN or ANSI
punches. For existing panels, pull out old analog meters and replace them with the
Shark® 200 meter. See Section 3.4 for Shark® 200T transducer installation. See
Chapter 4 for wiring diagrams.
NOTE: The drawings shown below and on the next page give you the meter dimen-
sions in inches and centimeters [cm shown in brackets]. Tolerance is +/- 0.1” [.25
cm].
Figure 3.1: Meter Front and Side Dimensions
0.06 [
0.15]
0.77 [1.95]
5.02 [12
.75]
Gasket
3.25 [8.26]
4.85 [12.32]
4.85 [12
.32]
0.95
[2.41]
Seitenansicht 48
1 2 ... 44 45 46 47 48 49 50 51 52 53 54 ... 297 298

Kommentare zu diesen Handbüchern

Keine Kommentare