Electro Industries Shark 200T Spezifikationen Seite 116

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 298
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 115
Doc# E149701 6 - 14
6: Using the Shark® 200 Meter
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
a. To enter the Address:
From the Adr screen:
• Use the Down button to select the number value for a digit.
• Use the Right button to move to the next digit.
NOTE: Using the faceplate you can enter addresses between 1 and 247;
if you want to enter a DNP address over 247, you need to enter the
address through software settings. Refer to Section 5.2.2.
b. To select the Baud Rate:
From the bAUd screen, use the Right button or the Down button to select the
setting you want.
c. To select the Protocol:
From the Prot screen, press the Right button or the Down button to select the
setting you want.
NOTE: If you are prompted to enter a password, refer to Section 6.2.4 for instruc-
tions on doing so.
2. When you have finished making your selections, press the Menu button twice.
3. The STOR ALL YES screen appears. Press Enter to save the settings.
Use buttons to enter Address Use buttons to select Baud Rate Use buttons to select Protocol
A
B
C
-
-
-
MENU ENTER
A
B
C
-
-
-
MENU ENTER
A
B
C
-
-
-
MENU ENTER
Seitenansicht 115
1 2 ... 111 112 113 114 115 116 117 118 119 120 121 ... 297 298

Kommentare zu diesen Handbüchern

Keine Kommentare